Young  Family  Website

 

 

Pool refurbishment

The pool was completed just in time for the fabulous weather we experienced during Auckland anniversary weekend.  Photo below left shows the condition the pool was in when we purchased the property.  The previous owners were ordered by Auckland City Council to keep the pool empty until the fencing complied.  We replaced the trellis you can see in the first photo (behind the trees) with a brustic fence and also added a glass fence between the house and pool.  The Council signed it off and refurbishment got underway.  Photo below right shows the pool after resurfacing.

Filling the pool with the garden hose took 35 hours.  In the photo below left, Belinda is paddling after it had been filling for around 12 hours.  The pool is around 9M long and slopes from 0.9M at the shallow end to 1.9M at the deep end.

The children couldn't wait to test it out, even though the water temperature is currently only 24 degrees.  Jamie invited a friend over and the three of them had a blast playing in the pool all afternoon.

 

We bought Jamie a remote control speed boat for his birthday last August and he was excited to finally get it in the water.  He even gave Caitlyn's Barbie a ride around the pool on the front of it.

Jamie and Caitlyn have been attending swimming lessons at a local college during the school holidays and they are progressing well.